Posts From March, 2017

Adding colors, gras and trees on Jakobs Creek

A lot of work have been done the last weeks. Coloring and installing all types of gras and trees are in progress.

Easy Water will be used in the waterfall.

Bridge work progress 2 on Jakobs Creek

There has been som progress on the bridges over Jakobs Creek.

The big stone arch bridge has got the stone pattern added. For the small bridge or viadukt to the right, the concrete surface have been added.

The concrete surface has also been added to the long wall. All patterns are printed on paper, using an inkjet printer, after some touchup in Photoshop. The concrete pattern is from a real world concrete wall, using a picture.

Later all the parts should be blended together with plaster, before coloring.