http://www.platelayer.com/Blog/ViewArchive.aspx?month=9&year=2010&pageid=1&mid=7

PlateLayer by Svein-Martin Holt

 

Posts From September, 2010

Coloring in progress

Now I have prepared the rocksurface on the module and it's near finish. The first coloring of the rock have been done. A test with some of my new trees from Loren Snyder. The foliage is put on for test.

A lot of more work to be done on the coloring on detailing of the surface.

 

Old layout removed, continue on modul

After the old section layout was removed and the room cleaned, the work continue on the modul.

I have molded some rockpieces, and have started to glue them in position.

I have also started the building of the riverbed and glued some rockpieces in the river. A lot of blending work are still to be done.