Posts From March, 2011

Final trackplan? 

A lot of minor changes the last days when the building of the layout has started.

Check out the different levels. Revison 4

16/03/2011

Many changes in trackplan 

Now when the building is in progress, a lot of changes have been done on the trackplan. I have removed some tracks and removed some problemareas.The lower level with Tehachapi loop is not shown here, but it is not changed and will be used as it is now.

 

09/03/2011