Backdrop installed using flooring Backdrop behind the layout is installed. I want to have curved corners and I used some flooring and have the backside out and painted it. I think it look fine. First layer of paint is done. The framework for the left part of the backdrop. Check the curved corners made with plywood. The backdrop is installed and painted. The door is open over the circuit breaker box. 15/02/2020 Categories: Zity Edge RR Previous Post << >> Next Post