The last weeks I have installed some more track and have good progress. Using MT flex-track on visible parts and Peco flex in tunnels and hidden areas.
The hidden station is in place and most of the outer double track. Still need to connect the handbuild turnouts. Also need to build many of them. In hidden areas I use Märklin turnouts.
Some minor changes in the trackplan as we build.