Layout in good progress The work with the framework is going well. Some trackbeds are in position and the first holes in the walls have been cut. Soon I must start to install some track. The trackplan still have some minor changes. 16/03/2011 Categories: Jakobs Creek RR Previous Post << >> Next Post