Near all track installed There have been done a lot the last days and now is near all track installed, except for the tracks in the main station. There are still missing some turnouts, but now the East Main Line, and up and down to Lower Line, can be run by train. The basement for the High Line is close to finish and tracks can soon be installed. Some final adjustments on the layout drawings has been done, so you can check out the final design here: Revision 8.1 of trackplan. < 15/06/2011 Categories: Jakobs Creek RR Previous Post << >> Next Post