Slow progress, turnouts installed

There has been slow progress the last months, but now I have installed 9 Tortoise motors under the turnouts on the West entrance of the station. 5 of the Tortoises are electrically connected to the frogs tonight, some remote cabels installed, but still some time will go before all the turnouts are installed and all tracks connected.

After that I need to build a lot of more turnouts, for the yard and the east entrance of the station. A little boring, but I think and hope that the end result will be better than using Märklin or other readymade turnouts. Time will show.